Commencement: August 2026
Project Budget: Agreed Rates
Stefan Consulting has been engaged to assist Council’s engineering team undertake flood impact assessments primarily for Development Applications relating to Low and Mid Rise (LMR) and State Significant Development (SSD) assessments.
Our team provide a strong understanding of broader catchment management principles, application to relevant guides, plans & policies and a pragmatic approach, required to achieving desired assessment outcomes.
Commencement: July 2026
Project Budget: $300K
We are providing Council with procurement, contract and project management services, for the supply and installation of Perimeter Protection Safety Bollards (Crash Tested/Rated) at both ends of Kiaora Lane, Double Bay, including all associated works.
Stefan Consulting is liaising closely with the various stakeholders to ensure minimal disturbance within this vibrant Kiaora Place community precinct.
Commencement: July 2026
Project Budget: $110K
The LMR policy, which took effect in February 2026, changes planning controls to encourage more low and mid rise housing to be built within 800 metres walk from nominated town centres and transport hubs and will require more basements to accommodate off street parking.
Council is receiving enquiries from the community regarding the impact of the changes, particularly their concerns about how more development could lead to flooding.
This work will provide a robust and defendable assessment of the potential impacts of the policy on groundwater. The work includes desktop data reviews, qualitative risk assessments, analytical & 3D groundwater modelling and technical advice to review planning provisions for LMR Housing Reform.
Stefan Consulting are engaged as client-side project managers to work closely with Council, SMEC Australia Pty Ltd appointed to deliver specialised hydrogeotechnical services, and other relevant stakeholders, to ensure effective project outcome delivery.
Commencement: April 2026
Project Budget: $20K
Council is looking at utilising its Council owned properties which offer opportunities to place internal advertising assets for a commercial return.
We are providing Council with project and contract management services, managing the public tender procurement of providers for the installation and management of advertising assets, at Council owned Kiaora Place Shopping Centre.
Various locations for advertising have been strategically selected in high pedestrian and high visibility areas within the Shopping Centre’s foyers and carpark.
A very comprehensive tender package was prepared, and we are currently in the tender assessment stage with a view to entering into a contract, up to a 10-year term, with a suitable vendor.
Commencement: February 2026
Project Budget: $140K
Inner West Council have commissioned Stefan Consulting in partnership with APV Valuers & Asset Management to inspect & assess approximately 360 buildings including all aquatic centres and complete a comprehensive 2025/26 valuation of their building assets portfolio. This also includes the inspection, assessment & valuation of approximately 2500 associated land improvement assets.
The project also includes the review and revaluation of approximately 180 parcels of Operational Land.
The project deliverables include a works program prepared for each building with details of capital & maintenance works required with estimated costs and a comprehensive final report including project findings & recommendations and overall building prioritisation.
Project completion is anticipated by end August/early September 2026.
Commencement: August 2025
Project Budget: $40K
Stefan Consulting is engaged to provide traffic, parking, drainage and associated civil engineering services for various aspects of the new residential aged care & associated facilities including retirement living, childcare, a church and a community hall at 116-132 Quakers Road, Marayong.
We are currently providing engineering support through the construction phase of the project.
Commencement: May 2025
Project Budget: $200K
Our team is currently working towards implementing a new booking system, intended to modernise Council’s current booking process to improve customer experience, streamline operations, and provide more efficient and reliable management of community spaces whilst minimising staff handling throughout the booking process. This will significantly improve access to Council’s multiple parks & amenities, open spaces, sportsfields and community venues available for public use.
Our team is managing this cross functional project through an established project governance structure and is managing several sub teams to undertake the required work to inform a new booking system. This includes compiling a Business Requirements Specification, reviewing all of Council’s relevant policies, procedures & processes, auditing Council’s hireable assets, auditing Council’s access & security systems and providing the appropriate communication and change management required along the way.
Stefan Consulting is managing the procurement to seek providers, select and engage a qualified supplier to implement a booking management system for Council’s community spaces. The new online booking system will provide 24/7 accessibility, allowing customers to view real-time availability, and make bookings at their convenience, minimising the need in dealing directly with Council.
Commencement: July 2023
Project Budget: $300K
We provided Council with project and contract management services overseeing the public tender procurement of providers for the installation and management of advertising assets on selected new and existing bus shelters and we are now managing the ‘roll-out’.
Each site is carefully assessed to ensure that all safety & design standards are met, including liaison with key stakeholders as required. Thirty seven (37) of the thirty-nine (39) shelters have been implemented to date, the remaining expected to be installed by the end of 2026.
We are also managing improvements to Council’s fifty (50) non-advertising shelters under the Contract, for ongoing maintenance & cleansing once upgraded. This will ensure that Council’s entire bus shelter assets are optimised over the 10-year term of the Contract.
Completed Projects
Commencement: March 2026
Completion: April 2026
Project Budget: $6K
Stefan Consulting was engaged to provide the analysis required and the preparation of a Civil Plan demonstrating the minimal amount of water to be managed on site through dispersion into the soil without any overland flow impacts and supporting Flood Statement.
The site was at 22 Station Street, Pymble.
Commencement: November 2023
Project Budget: $600K
We were engaged to assist Council with implementing a new LGA-wide integrated Parking Enterprise Management System (PEMS) including 23 new paid parking meters across multiple sites; implementation of a digital mobile licence plate recognition enforcement system (MLPR); the Strathfield Select Permit Scheme; the implementation of a new computer database system, a website permit portal for permit registrations and the introduction of a new AutoISSUE fines enforcement system.
We established effective project management methodology and expertise to ensure positive project deliverables and process & system changes all within the establishment of an approved governance structure which promoted close collaboration with Council’s key internal stakeholders who participated and worked closely to deliver the project.
The project was completed in April 2026.
Commencement: August 2025
Project Budget: $60K
Stefan Consulting was engaged to prepare this guideline document, to provide standardised, low-maintenance, and easy-to-follow design options, along with practical guidance, drawings, and specifications for planted urban streetscape upgrades. The designs aim to beautify and soften the streetscape while enabling efficient delivery, primarily using Council’s own trades staff.
The guidelines focus on delivering streetscape improvements that are visually appealing, low-maintenance, and functional. Key design considerations include the use of readily available and durable plant species, soil preparation, integration with existing and proposed civil infrastructure, and best practices for planting, mulching, and maintenance, all aimed at enhancing community amenity and environmental performance.
The project was completed in November 2025.
Commencement: November 2024
Completion: June 2025
Project Budget: $75K
Working with Council’s management and staff, Stefan Consulting was appointed to review indoor and outdoor business practices across the Roads Infrastructure and Parks and Open Spaces areas. The aim of the service review was to identify improvements that deliver increased operational efficiencies, enhance and simplify interactions with both internal and external customers and the overall performance of the business units.
Our vast experience with business reviews has positively impacted and assisted this project to deliver a detailed, professional snapshot of the current situation which will contribute to the development of a detailed report providing suitable recommendations and actions for improvement.
Commencement: September 2023
Completion: November 2024
Project Budget: $8M
Council’s Artarmon local centre streetscape upgrade project was undertaken to help improve pedestrian safety and shopping precinct visual quality.
Stefan Consulting was engaged to provide community liaison, communications, and marketing support to help the project meet its objectives. By educating the community, helping to identify and resolve issues, create and maintain healthy and positive relationships with local businesses, community members and key stakeholders, Stefan Consulting was able to positively contribute to the success of the project.
Our role included stakeholder management, strengthening local business relationships, regular updates, digital content, and supporting no-smoking outdoor dining and other key initiatives.
Commencement: August 2022
Completion: November 2024
Project Budget: $150K
Stefan Consulting was engaged as client-side project managers to work closely with Council, GHD Pty Ltd appointed to deliver specialised hydrogeotechnical services, and other relevant stakeholders, to ensure effective project outcome delivery.
The Geotechnical and Hydrogeological Study was undertaken in relation to the potential impacts of groundwater alteration as a result of future developments to the existing properties in Rose Bay.
This study was conducted in 4 stages comprising the identification of the study area, desktop review and the impact assessment, followed by various amendments to the Woollahra Development Control Plan.
Commencement: September 2023
Project Budget: $40K
Completion: September 2024
Stefan Consulting was engaged in September 2023 to undertake the civil and traffic design and associated services for the design of two raised pedestrian (wombat) crossings in Water Street and Cleveland Street, Wahroonga. The designs culminated in improved road and traffic safety and improvements to the road geometry, kerb & gutter, footpaths and access to properties and included significant street lighting upgrades.
Commencement: June 2024
Completion: August 2024
Project Budget: $1.5M
Council’s Naremburn local centre streetscape upgrade project was undertaken to help improve pedestrian safety, shopping precinct visual quality by creating a new space for the community to enjoy.
Stefan Consulting provided community liaison, communications, and marketing support for the 3-month Naremburn streetscape upgrade project ensuring the project met its objectives.
We ensured the business community, residents and key stakeholders were educated and informed regularly about the project’s progress, issues were identified and resolved, and positive and solid relationships were built to ensure the project’s success. This included stakeholder management, strengthening local business relationships, regular updates, and digital content to help promote the project.
Commencement: April 2024
Completion: August 2024
Project Budget: $40K
Stefan Consulting was engaged to conduct a comprehensive audit of Councils CBD footpaths. This included an assessment of several criteria encompassing the current condition, pedestrian safety risks, traffic volume, restoration works and adjacent facilities and led to the development of a customised prioritisation tool and associated methodology.
We physically inspected around three hundred (300) blocks within the Parramatta CBD to capture all required attributes including location, length, width, area, existing pavement, defects, severity and any restoration. This information was documented and the streets assessed were prioritised based on our findings, with a Footpath Renewal Projects List prepared incorporating recommendations for footpath corrections and/or upgrades.
This new sophisticated tool and methodology comprised assessment criterion, a scoring system, a data collection template and a spreadsheet that has detailed information beyond the footpath condition. Council can now selectively retrieve information to produce customised reports for any maintenance, restoration, renewal and upgrade program of works.
Commencement: February 2023
Project Budget: $200K
Ku-ring-gai Council engaged Stefan Consulting to assist Council to modernise its building assets, optimise ongoing operational and maintenance costs; identify asset type and function; develop criteria and guidelines; improve strategic decision making & create a modern buildings portfolio.
Working in partnership with Council’s Assets team, Stefan Consulting delivered:
- an innovative and unique customised prioritisation tool, with a more objective approach, to help prioritise building upgrade works using science-based outcomes required to justify decisions made in prioritising works
- concise methodology and criteria to assess Council’s 300+ building assets, identifying funding gaps
- the creation of detailed documentation including a final prioritised list of building upgrade works with estimated costings
- a 10-Year Program of Building Works to inform Council’s Long Term Financial Plan (LTFP), Council’s Delivery Program and the Buildings AMP
- a Final Report with Recommendations to support future Council budget allocations or reallocations towards Buildings, commencing 2024/25
- a Buildings Asset Management Plan (AMP).
The project was completed in June 2024.
The success of this project led to Stefan Consulting presenting at the NSW & ACT IPWEA 2025 State Conference in April 2025 together with Ku-ring-gai Council.
Commencement: August 2023
Completion: June 2024
Project Budget: $100K
Ku-ring-gai Council engaged Stefan Consulting to improve the methodology for the treatment of their stormwater assets.
In partnership with Council’s Asset Management team, we introduced the Optimal Renewal Methodology by undertaking a comprehensive revaluation of all stormwater drainage assets. Using existing and new CCTV data, we developed a pipe relining program providing significant evidence to support the development of a future stormwater assets renewal treatment strategy and componentised model.
As part of this project, Stefan Consulting delivered:
- A Prioritised Pipe Renewal Program
- A detailed Valuation Report for Drainage Assets
- An updated Drainage Asset Management Plan
- A Prioritisation Tool to prioritise Council’s stormwater drainage portfolio and determine the necessary treatments and associated costs to renew assets to an acceptable level.
Our work which supported the introduction of the Optimal Renewal Methodology significantly helped reduce Council’s depreciation.